Installation & Service

Professional Setup by Certified Technicians

Free Professional Installation

Every Preston battery purchase includes complimentary installation and demonstration by our trained service engineers.

Certified Technicians

All installers trained & certified on Preston products

Same-Day Service

Installation scheduled within 24 hours of delivery

Safety First

Proper grounding, connections, and safety checks

Installation Process

1

Site Inspection

Check inverter & wiring compatibility

2

Old Battery Removal

Safe disconnection & removal

3

New Battery Setup

Positioning & secure placement

4

Wiring & Connection

Proper cable sizing & terminals

5

Testing

Load test & backup verification

6

Demo & Documentation

Usage training & warranty card

What's Included

  • Complete battery installation at your location
  • Connection to existing inverter/UPS
  • Basic wiring & terminal connections (up to 3 meters)
  • Old battery removal & eco-friendly disposal
  • Functionality testing & demo
  • Basic maintenance training
  • Warranty card filling & registration

Important Notes

Free Installation Limitations:
  • Standard installation (residential/small commercial)
  • Existing inverter must be functional
  • Standard cable length up to 3 meters included
  • Complex setups may require additional charges
  • Installation within 20km radius of service center is free
Additional Charges May Apply For:
  • Extra long cable runs (beyond 3 meters)
  • Complex commercial installations
  • Multiple battery banks or parallel connections
  • Locations beyond 20km from service center
  • Inverter repair/replacement (if needed)

Schedule Installation

Contact our service team to book your free installation appointment.

Call: +91 98765 43210 WhatsApp Us